Designating Bell's Sports Centre, Perth
Feedback updated 11 Apr 2024
We asked
From 7 December 2023 to 23 February 2024, Historic Environment Scotland (HES) sought views on a proposal to list Bell’s Sports Centre in Perth.
Bell’s Sports Centre, opened in 1968, is one of Scotland’s earliest purpose-built, indoor sports centres. The domed sports hall has special architectural and historic interest as an exceptional surviving example of a new building type that developed in the second half of the 20th century. Designed to accommodate a range of sporting courts and community activities, the building reflects the increase in leisure time and the importance placed on health and well-being for wider public benefit during this period. It is the only domed sports facility in Scotland, and it is the second example of a domed sports hall to be built in the United Kingdom.
Through Citizen Space, we invited members of the public to tell us if they agreed with the proposed designation and if they had further comments to make.
We consulted directly with Perth and Kinross Council as the planning authority and owner of the site, and the tenants of the building.
Our selection guidance for designation and the policies we work to are published in the Designations Policy and Selection Guidance document.
You said
We received a total of 40 responses to consultation, including one response from the local authority, one response from an interested party and 38 responses to our online survey.
The overwhelming majority of people who responded expressed strong support for the designation. No one raised issues that brought into question the cultural significance of the site for designation. However, many of the comments noted the flood risk at the site and the perceived impact listing may have on the future use of the building.
We have reported in more detail on the consultation in our Report on Handling, which can be downloaded from the Heritage Portal or from the bottom of this page.
Comments from the online survey are published in full (where we have appropriate permissions). The report can be downloaded from the bottom of this page.
We did
After considering the comments received during consultation, we have
-
Listed the structure at category B as Sports arena block, including dome, changing rooms and offices at Bell’s Sports Centre, excluding all other structures and buildings, Hay Street, Perth
We have published a Report on Handling for this case on the Heritage Portal. This can also be downloaded at the bottom of this page.
PDF Files:
-
Online Consultation Survey Report - Bell's Sports Centre
Overview
We propose to designate Bell's Sports Centre as a listed building.
Bell’s Sports Centre, opened in 1968, is one of Scotland’s earliest purpose-built, indoor sports centres. The domed sports hall has special architectural and historic interest as an exceptional surviving example of a new building type that developed in the second half of the 20th century. Designed to accommodate a range of sporting courts and community activities, the building reflects the increase in leisure time and the importance placed on health and well-being for wider public benefit during this period. It is the only domed sports facility in Scotland, and it is the second example of a domed sports hall to be built in the United Kingdom.
We are now gathering views on our proposal to list this building at category B.
Read more about why we think Bell's Sports Centre meets the criteria for listing by downloading our Report of Handling.
How we designate listed buildings
We list buildings of special architectural or historic interest. A dedicated team researches and assesses all designation applications.
- Watch our video about how we list buildings
- Find out more about listed buildings in the Advice and Support section of the Historic Environment Scotland website.
- Read ourDesignation Policy and Selection Guidance (2019)
Why your views matter
We’d love to know whether you agree with our proposal.
To help you respond to the following survey, please read why we think the Bell's Sports Centre meets the criteria for listing by downloading our Report of Handling.
You can tell us if you agree with our proposal by completing the short questionnaire below.
This questionnaire usually takes 5 minutes to complete.
Find out what comments we consider and what happens next in our consultation guide.
Update: The deadline for this survey has been extended from 18 January to 23 February 2024.
Share
Share on Twitter Share on Facebook